NaSA PoD Update #8

Since our last update, we worked very hard to have the PoD ready for our Earth Day reveal – but unfortunately, that did not happen. The conversion time is taking longer than we anticipated so we are now simply working to complete the PoD – with no set due date. This removed the notion of a deadline from the project and at the same time relieved some of the stress I felt because of that deadline. Now, with the anxiety of the deadline removed I feel far more at ease with things and much progress is happening at the pace at which it needs to happen.

That all being said – we are getting very close to completion.

We have completed over 90% of the PoD’s new educational/electrical/plumbing systems and all that remains includes the following:

Solar-electrical – over 95% complete: Most of the solar electronic components are now installed and all that remains is configuring the inverter, and some wire management issues.

Plumbing: 95% complete and working! All that remains is the installation of the composting toilet – this item is not time-sensitive and/or imperative to the initial operation of the PoD and will happen at some point over the next few months.

Exterior: 80% complete. All that remains is the installation of the microscope table*, flatscreen monitor mounting structure*, and painting of the PoD – these items are not imperative to the initial operation of the PoD and will happen over the next few weeks.

Interior: 99% complete! All that remains is the re-installation of the removed “furniture” from the interior of the RV as well as some finishing touches Marian will be making such as appropriately themed curtains.

Below is some of the work we have completed over the last few weeks.

We installed the Solar Inverter Battery Support Structure (SIBaSS – pronounced “Sea Bass”) into its final location in the solar-electronics gear cabinet.

We then installed the inverter, Battery Management System (BMS)/Lynx Distributor assembly, Charge controllers, and the two lower batteries.

We installed most of the heavy gauge wiring between the charge controllers and inverter to the distributor as well as the massive cables from the distributor to the batteries.

Wire management is most important. The next photo shows wires that are not yet managed.

We had to “MacGyver” a way to insulate the huge battery cables where they pass over and through the support structure. The black insulator is made from a thick, rubber, radiator hose from a large truck.

The “brains” of the system. This Cerbo GX device will allow me to monitor the real-time data from the solar-electronics system such as DC solar input, battery SOC, charging status, inverter status, AC/DC input, and output, as well as control the individual components of the system and share all of that information with my students and program participants via a Bluetooth connection to the presentation monitor on the outside of the PoD.

The AC/DC fuse/load panels are in place.

We moved the spare wheel and tire assembly from the back of the PoD to the tongue. Since we have done away with the gas bottles taking up space on the tongue, we have ample space to mount the spare. We also used the original clamp from the gas bottles as a hold-down for the wheel and tire assembly.

Moving the wheel/tire assembly freed up the space on the back of the PoD where we have installed a new access hatch that allows external access to the storage space under the bed. This will allow easy access to programming materials during classes 🙂

Lastly, we topped off the state of charge (SOC) in all four of the batteries in preparation for connecting them to the system this week!! We are about to bring the PoD to life!

In other news – Lucky the Eastern box turtle came out of hibernation this past week 🙂

If you live in an area with box turtles please keep watch for them crossing roads – especially during and after warm weather rain showers when they are most active. When you see them crossing the road please help them across to the side they are heading toward because they are on “important turtle business” and need our help crossing roads.

However, please do not take them home as “pets” or release them in areas that you believe are somehow better for them – they are protected by law in most places, and moving them far from their home range is stressful and detrimental to their health and the health of wildlife due to the potential vectoring of novel diseases and parasites and wildlife populations.

_________________________________________________

Stay tuned for all the awesome that is on the way – and a new video will be ready soon!

This amazing project will serve to inspire and educate all the curiosity seekers who encounter it. But to do this right – we need your support. If you choose to assist us in making this project a reality, this unique mobile classroom will greatly benefit the nature and wildlife conservation, science, reality, common sense, and renewable energy awareness education for all our outreach program participants in the WNC region as well as our wonderful students at Trails Carolina and Trails Momentum who will all greatly benefit from the wonders it will contain while they are in class and in the field on expedition. 

 Please consider supporting this project via the donate link on our website or our GoFundMe page:   www.gofundme.com/lets-build-a-mobile-outreach-classroom

The construction and use of this unique mobile classroom will be documented on this blog, in our end-of-year newsletter, and on our YouTube channel.  

The ENP NaSA PoD and the Mighty Bolt EV (our primary outreach vehicle) are owned by ENP and used primarily as the ENP company outreach vehicle and mobile outreach classroom.  They will be powered and fueled primarily with cleanly-generated electricity provided by the ENP/Trails student-built classroom solar array and NaSA PoD’s rooftop solar array. They will both serve as outstanding teaching tools for our Trails students, ENP outreach program participants, and everyone we meet via our outreach programs.

THANK YOU to everyone who has supported and is continuing to support this most unique project – you are all the greatest of heroes!!!

Please note: any/all ads that appear within or below this post are not provided or endorsed by ENP nor are we supported in any way by these ads – they are an automated feature of WordPress.com.

NaSA PoD Update #7

Over the last two weeks, much has happened with the development of the

SS NaSA PoD.

We have made so much progress I have decided to make this update as a video. It is a bit longer than the 30-second click-bait style video clips most people are used to today. Its length is due to its real content – but if you want real content you must be patient and focused, and open to learning.

Now, sit back and enjoy a detailed overview of our progress.

Stay tuned for all the awesome that is on the way.

We hope to have the ENP NaSA PoD in service on or before Earth Day 2022!

This amazing project will serve to inspire and educate all the curiosity seekers who encounter it. But to do this right – we do still need your support. If you choose to assist us in making this project a reality, this unique mobile classroom will greatly benefit the nature and wildlife conservation, science, reality, common sense, and renewable energy awareness education for all our outreach program participants in the WNC region as well as our wonderful students at Trails Carolina and Trails Momentum who will all greatly benefit from the wonders it will contain while they are in class and in the field on expedition. 

 Please consider supporting this project via the donate link on our website or our GoFundMe page:   www.gofundme.com/lets-build-a-mobile-outreach-classroom

The construction and use of this unique mobile classroom will be documented on this blog, in our end-of-year newsletter, and on our YouTube channel.  

The ENP NaSA PoD and the Mighty Bolt EV (our primary outreach vehicle) are owned by ENP and used primarily as the ENP company outreach vehicle and mobile outreach classroom.  They will be charged and fueled primarily with cleanly generated electricity provided by the ENP/Trails student-built classroom solar array and NaSA PoD’s rooftop solar array. They will both serve as outstanding teaching tools for our Trails students, ENP outreach program participants, and everyone we meet via our outreach programs.

THANK YOU to everyone who has supported and is continuing to support this most unique project – you are all the greatest of heroes!!!

Please note: any/all ads that appear below this post are not provided or endorsed by ENP nor are we supported in any way by these ads – they are an automated feature of WordPress.com.